Services

Wet rooms and showers.

The pan, curb and walls read as one piece. Waterproofing is part of the build-up, under the finish coats.

Microcement shower pan, curb and walls finished as one continuous surface, mid-installation

One continuous surface, floor to wall.

In a shower that means the pan, the curb and the walls read as one piece — no grout lines, no tile edges, no transition strip where a shower floor meets its walls.

Is it waterproof?

Wet areas are waterproofed as part of the build-up and the finished surface is sealed. Waterproofing is a distinct layer under the decorative microcement finish, not the finish coat itself.

Can it go over existing tile?

In most cases yes, once a licensed installer inspects the substrate. The tile is cleaned and prepared, then coated — the usual approach in a remodel, since it avoids demolition.

Book a Consultation

Freestanding tubs

Tub surrounds finished in the same system as the floor and walls around them, indoors or facing a view.

Freestanding tub set into a dark microcement surround

Wet rooms

Open showers without a curb, floor and walls poured as a single sloped surface.

Wet room with a freestanding tub and frosted glass shower divider on a microcement floor

By Appointment

See and feel the finishes before you decide.